Rehab BEQ 33531, Marine Corps Base
Camp Pendleton, CA

Repair BEQ 31506, Marine Corps Base
Camp Pendleton, CA

Repair BEQ 2405, Marine Corps Base
Camp Pendleton, CA


ADDITIONAL PROJECTS:

Repair BEQ 14008, MCB, Camp Pendleton, CA
Rehab BEQs 31603 & 31612, MCB, Camp Pendleton, CA
Repair BEQs 1616, 1464 and 1465, MCAGCC, Twentynine Palms, CA
Repair/Renovate BEQ 210632, MCB, Camp Pendleton, CA
Repair/Renovate BEQ 53599, MCB, Camp Pendleton, CA
Repair BEQ 33605, MCB, Camp Pendleton, CA
Repair BEQ 22207, MCB, Camp Pendleton, CA
Repair BEQ 31511, MCB, Camp Pendleton, CA
Repair BEQ 31613, MCB, Camp Pendleton, CA
Repair BEQ 2405, Marine Corps Base
Camp Pendleton, CA

Design-Bid-Build
Renovation/Repair

Building 2405 is a three-story, 39,000 SF concrete and masonry structure that was renovated inside and out. The existing electrical, mechanical and plumbing systems were replaced with new, more efficient systems. All interior walls, existing entry storefronts, lighting, doors and jambs were completely demolished and reconstructed. New roofing, flashing, drains and overflows were provided and all rooftop equipment was removed. All interior and exterior finishes were replaced. Fire sprinklers were provided throughout. Broken concrete walkways were replaced and retaining walls have been designed to control erosion and drainage. All existing sewer lines were replaced and connected to the nearest manhole. Entry patios and landscaping have been introduced to enhance the aesthetic appeal and environment surrounding the building.