Repair/Improve Mess Halls 53502 & 53402, Marine Corps Base
Camp Pendleton, CA

Repair Mess Hall Building 210802, Marine Corps Base
Camp Pendleton, CA


ADDITIONAL PROJECTS:

Repairs/Additions to Building 2403, MCB, Camp Pendleton, CA
Repair/Improve Mess Hall Building 22186, MCB, Camp Pendleton, CA
Repair/Improve Mess Hall 31611, MCB, Camp Pendleton, CA
Repair Mess Hall 43402, MCB, Camp Pendleton, CA
Repair Mess Hall Building 210802, Marine Corps Base
Camp Pendleton, CA

Design-Bid-Build
Renovation/Repair

Building 210802 was completely renovated. The capacity of the mess deck was increased by 120 patrons, thanks to a food service study that allowed for an expanded, more efficient layout. The structure was upgraded to meet current seismic requirements and the roof replaced with a cold-applied roofing system.

New, efficient HVAC systems were provided. Piping was replaced throughout the building and the electrical system was upgraded, with new, energy-efficient fixtures. Existing restrooms were rehabilitated and new ADA-compliant restrooms were provided for men and women patrons. A new fire protection system was installed and connected with the base-wide system. All interior and exterior finishes were replaced.